Location

Federico II plant (Cerano, Brindisi, Puglia)

Type of plant

Coal-fired thermoelectric plant

Area extension

2.700.000 m²

Context

Agricultural /Industrial

The competition

Enel Produzione S.p.A.,  a company in the Enel Group S.p.A., has launched a private, transparent and non-discriminatory Design Competition to select proposals for improving the architecture and landscape at the Brindisi industrial site.

The contest deadline expired on February 1st, 2021. In order to ensure that the proposals are more compliant with the constraints set out in the Call for Bids and the attachments, the competition has been reopened. This is, however, only for those entrants who submitted a proposal before the previous deadline, which was on February 1st. The new proposal must be submitted before the new deadline, which is June 30th.

Documentation

PDF (0.8MB)DOWNLOAD